Facilities Presentations Archive
Facilities Presentations Archive
-
- Lakeview MS 40 pct Construction Community Meeting 2.26.25
- Timber Creek HS 30 pct Design Community Meeting 2.24.25
- Site 126-E-4 30 pct Design Community Meeting 2.20.25
- Whispering Oak ES 40 pct Construction Community Meeting 2.19.25
- Westridge MS 40 pct Construction Community Meeting 2.18.25
- Jones HS 10 pct Design Community Meeting 2.12.25
- Palmetto ES 30 pct. Design Community Meeting 1.23.25
- Endeavor ES 100 pct. Design Construction Kick Off 1.16.25
- Avalon ES 100 pct. Design Construction Kick Off 1.13.25
- Citrus ES 100 pct. Design Construction Kick Off Video Presentation 1.9.25
- Citrus ES 100 pct. Design Construction Kick Off 1.9.25
- Camelot ES 100 pct. Design/Construction Kick Off 1.7.25
-
- Ocoee MS 30 pct. Design Community Meeting Video 12.12.24
- Ocoee MS 30 pct. Community Meeting 12.12.24
- Oakshire ES 30 Percent Design Community Meeting
- Site 130-E-2 40% Construction Community Meeting
- Colonial HS 100% Design/Construction Kick-Off Video of Presentation
- NorthLake Park CS 30% Design Community Meeting 5.15.24
- Lawton Chiles ES 30% Design Community Meeting 5.13.24
- Site 97-E-2 100 Design/Construction Community Meeting 5.7.24
- Site 130-E-2 100% Design/Construction Community Meeting 2.22.24
- OTC-East 40% Construction Community Meeting 2.15.24
- Site 47-E-4 40% Construction Community Meeting 2.8.24
-
- Site 97-E-2 30% Design Community Meeting 12.7.23
- Site 129-M-2 40% Construction Community Meeting 12.5.23
- Hunter's Creek MS 100% Design/Construction Community Meeting 12.4.23
- Westridge MS 100% Design/Construction Community Meeting 11.13.23
- College Park MS 100% Design/Construction Community Meeting 11.6.23
- Camelot Elementary School 30% Design Community 10.30.23
- Endeavor Elementary School 30% Design Community Meeting 10.26.23
- Site 50 40% Construction Community Meeting 10.12.23
- Citrus Elementary School 30% Design Community Meeting 10.11.23
- Avalon Elementary School 30% Design Community Meeting 10/09/23
- Colonial High School 60% Design Community Meeting 9.28.23
- Oak Ridge High School's 30% Design Community Meeting 9.28.23
- OTC-West 40% Construction Community Meeting 09.20.23
- Windermere High School Outdoor Stadium Community Meeting Presentation 08.23.23
- OTC-East Campus 100 Percent Design/Construction Kick-Off Presentation 06.26.23
- OTC-East Campus Traffic Study
- Winter Park HS 100% Design/Construction Kick-Off Presentation 05.17.23
- Howard MS 100% Design/Construction Kick-Off Presentation 05.15.23
- Site 47-E-W-4 100% Design/Construction Kick-Off Presentation 04.24.23
- Whispering Oak ES 30% Design Presentation 04.19.23
- Hunter's Creek ES 30% Design Presentation 04.12.23
- Hunter's Creek MS 30% Design Presentation 04.10.23
- Dr. Phillips ES 30% Design Presentation 04.05.23
- College Park MS 30% Design Presentation 03.23.23
- Westridge MS 30% Design Presentation 03.20.23
- Site130-E-SE-2 30% Design Presentation 03.08.23
-
- Three Points ES 100% Design/Construction Kick-Off Presentation 12.15.22
- Winter Park HS 60% Design Presentation 12.14.22
- Water Spring MS (Site 65-M-W-4) 40% Construction Presentation 12.12.22
- Site 47-E-W-4 30% Design Presentation 10.26.22
- Colonial HS 30% Design Presentation 10.24.22
- Site 129-M-SE-2 60% Design Presentation 10.17.22
- Site 50-H-SE-2 100% Design/Construction Kick-off Presentation 09.22.22
- Winter Park HS 30% Design Presentation 09.19.22
- Site 129-M-SE-2 30% Design Presentation 07.28.22
- New Elementary School Prototype Visioning Meeting (10% Design) 06.30.22
- Site 50-H-SE-2 60% Design Presentation 05.23.22
- OTC - East Campus 60% Design Presentation 05.19.22
- Lakeview MS 30% Design Presentation 05.16.22
- OTC - West Campus (Site 73-T-W-7) 100% Design/Construction Kickoff Presentation 05.12.22
- Site 129-M-SE-2 10% Design Presentation 05.05.22
- Howard MS 30% Design Presentation 05.04.22
- Three Points Elementary 30% Design Presentation 03.30.22
- Site 30-E-SE-3 (Stonewyck ES) 40% Construction Presentation 03.07.22
- Site 114-E-W-4 (Panther Lake ES) 40% Construction Presentation 03.01.22
- Proposed West Bus Compound Planning Presentation 02.16.22
- Site 89-E-W-4 (Hamlin ES) 40% Construction Presentation 02.15.22
- OTC - East (Site 512-T-E-1) 30% Design Presentation 02.07.22
- Water Spring MS 100% Design/Construction Kickoff Presentation 1.18.22
- Site 50-H-SE-2 30% Design Presentation 1.10.22
-
- Site 132-M-W-4 (Hamlin MS) 40% Construction Presentation 10.19.21
- OTC - East 10% Design Presentation 10.13.21
- Site 50-H-SE-2 10% Design Presentation 09.23.21
- Site 90-K8-N-7 40% Construction Presentation 09.02.21
- Site 73-T-W-7 (OTC-Westside) 60% Design Presentation 08.19.21
- Jones HS Capital Renewal Presentation 07.28.21
- Water Spring MS 60% Design Presentation (Site 65-M-W-4) 06.15.21
- Site 204-AE-N-7 30% Design Presentation (Wheatley Adult Education Center) 5.24.21
- Site 30-E-SE-3 100% Design/Construction Kickoff Presentation 5.3.21
- Site 114-E-W-4 100% Design/Construction Kickoff Presentation 04.28.21
- Site 89-E-W-4 100% Design/Construction Kickoff Presentation 04.22.21
- Water Spring MS 30% Design Presentation 03.02.21
- Site 43-E-SE-2 40% Construction Presentation 02.25.21
- Orange Technical College - Orlando 100% Design/Construction Kickoff Presentation 2.18.21
-
- Site 90-K8-N-7 100% Design/Construction Kickoff Presentation 12.09.20
- Site 132-M-W-4 100% Design/Construction Kickoff Presentation 12.07.20
- Gateway/Cherokee Consolidation (Silver Pines Academy) 40% Construction Community Meeting Presentation 10.29.20
- School Impact Fee Update 10.27.20
- Site 114-E-W-4 30% Design Community Meeting Presentation 10.08.20
- Site 30-E-SE-3 30% Design Community Meeting Presentation 10.07.20
- Site 89-E-W-4 30% Design Community Meeting Presentation 09.24.20
- Site 113-H-W-4 40% Construction Community Meeting Presentation 08.17.20
- Site 80-H-SW-4 40% Construction Community Meeting Presentation 08.12.20
- Orange Technical College - Orlando 60% Design Community Meeting Presentation 07.23.20
- Site 132-M-W-4 60% Design Community Meeting Presentation 07.28.20
- Edgewater HS Field Lighting Presentation 07.27.20
- Site 43-E-SE-2 100% Design/Construction Kick-off Community Meeting Presentation 07.20.20
- Site 90-K8-N-7 60% Design Community Meeting Presentation 07.16.20
- Winegard ES 40% Construction Community Meeting Presentation 03.09.20
- Site 85-E-W-4 40% Construction Community Meeting Presentation 03.04.20
- Pinar Elementary 40% Construction Community Meeting Presentation 02.26.20
- Site 83-E-SE-3 40% Construction Community Meeting Presentation 02.24.20
- Site 20-E-SW-4 40% Construction Community Meeting Presentation 02.20.20
- Magnolia School 40% Construction Community Meeting Presentation 02.06.20
- Jones HS Capital Renewal Community Meeting Presentation 01.27.20
- Site 43-E-SE-2 30% Design Community Meeting Presentation 01.16.20
- Site 73-T-W-7 30% Design Community Meeting Presentation 01.16.20
- Rolling Hills Elementary 40% Construction Community Meeting Presentation 01.15.20
- Orange Technical College - Orlando 10% Design Community Meeting Presentation 01.13.20
-
- Site 80-H-SW-4 100% Design/Construction Kick-off Community Meeting Presentation 09.12.19
- Site 73-T-W-7 10% Design/Program Verification Community Meeting Presentation 08.26.19
- Site 113-H-W-4 100% Design/Construction Kick-Off Community Meeting Presentation 08.19.19
- School Planning and CEAs Board Presentation 06.18.19
- Meadow Woods MS Comprehensive Renovation Design Community Meeting Presentation 04.30.19
- Site 113-H-W-4 60%Design Presentation 04.29.19
- Site 83-E-SE-3 100% Design/Construction Kick-off Presentation 04.29.19
- Winegard ES 100% Design/Construction Kick-off Presentation 04.25.19
- Site 80-H-SW-4 60% Design Presentation 04.22.19
- Pinar ES 100% Design/Construction Kick-off Presentation 04.17.19
- Site 83-E-SE-3 100% Design/Construction Kick-off Presentation 04.29.19
- Winegard ES 100% Design/Construction Kick-off Presentation 04.25.19
- Site 80-H-SW-4 60% Design Presentation 04.22.19
- Pinar ES 100% Design/Construction Kick-off Presentation 04.17.19
- Facilities Services Board Presentation 04.16.19
- Site 85-E-W-4 100% Design/Construction Kick-off Presentation 04.15.19
- Rolling Hills ES 100% Design/Construction Kick-off Presentation 04.15.19
- Gateway/Cherokee 100% Design/Construction Kick-off Presentation 04.08.19
- Magnolia ESE Campus 100% Design/Construction Kick-off Presentation 04.08.19
- Site 113-H-W-4 30% Design Presentation 03.07.19
- Lake Gem ES 40% Construction Presentation 03.13.19
- Site 20-E-SW-4 100% Design/Construction Presentation 03.27.19
- Acceleration West 60% Design Presentation 03.06.19
- Sunrise ES 40% Construction Presentation 02.25.19
- Site 25-E-SW-4 40% Construction Presentation 02.20.19
- Deerwood ES 40% Construction Presentation 02.11.19
- Site 80-H-SW-4 30% Design Presentation 02.6.19
- Site 49-E-W-4 40% Construction Presentation 01.28.19
- Site 113-H-W-4 10% Design/Program Verification Presentation 01.23.19
- Windermere HS Special Exception Modification Request 01.23.19
-
- Cherokee Neighborhood Community Update 11.14.18
- Site 80-H-SW-4 10% Program Verification Presentation 11.08.18
- Gateway/Cherokee ESE Consolidation 60% Design Presentation 10.22.18
- Magnolia School 60% Design Presentation 10.22.18
- Site 208-K8-SE-3 40% Construction Presentation (Pershing/Pine Castle k-8) 10.24.18
- How OCPS Plans Schools - Live Town Hall Presentation 08.29.18
- Site 83-E-SE-3 30% Design Presentation 09.24.18
- Site 85-E-W-4 30% Design Presentation 09.19.18
- Rolling Hills ES 30% Design Presentation 09.06.18
- Magnolia-Gateway-Cherokee 30% Design Presentation 08.08.18
- Pinar ES 30% Design Presentation 08.20.18
- Winegard ES 30% Design Presentation 08.22.18
- Site 49-E-W-4 100% Design Presentation 3.1.18
- Site 20-E-SW-4 Planning 30% Design-Presentation 05.21.18
- Southwest MS 60% Design Presentation 06.06.18
- Boone HS Auditorium 100% Design Presentation 04.09.18
- Southwest MS 30% Design Presentation 03.28.18
- Deerwood ES 100% Design Presentation 03.1.18
- Facilities Board Presentation 03.29.18
- Pine Hills ES 40% Construction Presentation 2.26.18
- Hillcrest ES 40% Construction Presentation 2.26.18
- Cypress Park/Durrance ES 40% Construction Presentation 2.21.18
- Sunrise ES 100% Design Presentation 2.20.18
- Dover Shores ES 40% Construction Presentation 2.14.18
- Frangus ES 40% Construction Presentation 2.12.18
- Hungerford ES 40% Construction Presentation 2.12.18
- Hidden Oaks ES 40% Construction Presentation 2.5.18
-
- Site 49-E-W-4 100% Design Presentation 3.1.18
- Deerwood ES 100% Design Presentation 3.1.18
- Pine Hills ES 40 Construction Presentation 2.26.18
- Hillcrest ES 40% Construction Presentation 2.26.18
- Cypress Park/Durrance ES 40% Construction Presentation 2.21.18
- Sunrise ES 100% Design Presentation 2.20.18
- Dover Shores ES 40% Construction Presentation 2.14.18
- Frangus ES 40% Construction Presentation 2.12.18
- Hungerford ES 40% Construction Presentation 2.12.18
- Hidden Oaks ES 40% Construction Presentation 2.5.18
- Site 25-E-SW-4 100% Design Presentation 1.29.18
- Maxey ES 40% Construction Presentation 1.22.18
- Boone HS Design Presentation 10.30.17
- Audubon Park 40% Construction Presentation 10.25.17
- Site 25-E-SW-4 60% Design Presentation 10.25.17
- Site 37-M-SW-4 100% Design Presentation 10.18.17
- Site 205-K8-SW-6 40% Construction Meeting 9.25.17
- Sunrise ES 30% Design Presentation 9.25.17
- Lake George ES 30% Design Presentation 9.20.17
- Lake Gem ES 30% Design Presentation 9.18.17
- Site 25-E-SW-4 30% Design Presentation 9.6.17
- Deerwood ES 30% Design Presentation 9.6.17
- Pershing K-8 100% Design & Planned Development/Status Presentation 8.28.17
- Corner Lake MS 60% Design Presentation 8.23.17
- Site 37-M-SW-4 60% Design Presentation 7.27.17
- Pershing/Pine Castle K8 Land Use & 60% Design Presentation 6.21.17
- Site 37-M-SW-4 30% Design Presentation 5.25.17
- Maxey ES 100% Design Presentation 5.15.17
- Pershing/Pine Castle ES 30% Design Presentation 4.26.17
- Hungerford ES 100% Design Presentation 4.24.17
- Corner Lake MS Comprehensive Renovation Presentation 4.19.17
- Pine Hills ES 100% Design Presentation 4.17.17
- Hillcrest ES 100% Design Presentation 4.5.17
- Union Park ES 100% Design Presentation 3.29.17
- Facilities Board Workshop 2017
- Frangus ES 100% Design Presentation 3.15.17
- Cypress Park/Durrance ES 100% Design Presentation 3.9.17
- Meadow Woods ES 40% Construction Presentation 3.8.17
- Dover Shores ES 100% Design Presentation 3.6.17
- Hidden Oaks ES 100% Design Presentation 2.21.17
- Durrance/Cypress Park ES Merger Presentation 1.30.17
- PS8 Community School Update 1.23.17
- Site 84-E-W-4 40% Construction Community Presentation 1.23.17
- Maxey ES 60% Design Community Presentation 1.23.17
- Site 133-K8-N-6 100% Design Presentation 1.11.17
- Pershing/Pine Castle ES PTA Meeting Presentation 1.10.17
- Hillcrest ES 30% Design Presentation 1.4.17
-
- Lake Como/Kaley K-8 Planning Presentation 03.16.16
- Ivey Lane 30% design presentation 03.28.16
- MetroWest ES relief (Site 84-E-W-4) Design Presentation 03.30.16
- Site 44-E-SE-2 (Lake Nona area elementary) 30% Design Meeting 2.29.16
- Site 27-H-W-4 West Orange relief high school 100% Design Presentation
- Site 84-E-W-4 (MetroWest ES Relief) 30% Design presentation
- Engelwood ES 40% Construction Presentation 11.28.16
- Frangus ES 30% Design Presentation 11.14.16
- Site 44-E-SE-2 40% Construction Presentation 12.7.16
- Windermere HS 40% Construction presentation 11.02.16
- Carver MS 40% Construction Presentation 10.26.16
- Site 205-K8-SW-6 100% Design presentation 10.24.16
- Union Park ES 30% Design Presentation 10.17.16
- Maxey ES 30% Design presentation 10.17.16
- Hungerford ES 30% Design Presentation 10.05.16
- Site 52-M-SE-2 40% Construction Presentation 10.3.16
- Dover Shores ES 30% Design Presentation 9.28.16
- Pine Hills ES 30% Design Presentation 9.26.16
- Hidden Oaks ES 30% Design Presentation 9.26.16
- Site 131-PS8-SW-5 40% Construction Presentation 9.21.16
- Site 21-M-E-2 40% Construction Presentation 9.14.16
- Site 205-K8-SW-6 60% Design Presentation 8.22.16
- Site 133-K8-N-6 Project Update Presentation 8.17.16
- 80-H-SW-4 Land use plan Presentation 7.27.16
- Cypress Park ES 30% Design Presentation 7.25.16
- Rock Lake ES 100% Design presentation 6.06.16
- Ivey Lane ES 100% Design Presentation 5.18.16
- Mollie Ray ES 100% Design Presentation 5.23.16
- Oak Hill ES 100% Design Presentation 6.08.16
- Capital Budget Work Session 05.19.2016
- Site 205-K8-SW-6 30% Design Presentation 6.07.16
- Solar Energy Presentation 5.12.16
- Ivey Lane ES 100% Design and Construction Presentation 5.18.16
- Site 84-E-W-4 (Metrowest ES Relief) 100% Design and Construction Presentation 5.23.16
- Mollie Ray ES 100% Design and Construction Presentation 5.23.16
- Site 44-E-SE-2 100% Design Presentation 5.18.16
- Engelwood ES 100% Design Presentation 05.16.16
- Meadow Woods ES 100% Design and Construction Presentation 5.09.16
- Facilities Settlement Agreement Update 5.10.16
- Annual Facilities School Board Update 04.19.16
- Rock Lake ES 60% Design Presentation 4.18.16
- Ventura Elementary 40% Construction Presentation 04.06.16
- Mollie Ray ES 30% Design Presentation 4.06.16
- Site 84-E-W-4 60% Design Presentation 3.30.16
- Existing and Proposed Locations w SBD 1516
- Site 117-E-SW-4 40% Construction Presentation 3.07.16
- Oak Hill ES 30% Design Presentation 3.07.16
- Meadow Woods Replacement ES 30% Design Presentation 3.09.16
- Oak Hill ES 30% Design Presentation 3.7.16
- Rock Lake ES 30% Design Presentation 02.29.16
- Engelwood ES 30% Design presentation 2.24.16
- Site 2-K-8-E-1 40% Construction Presentation 2.10.16
- Lockhart ES 40% Construction Presentation 02.01.16
- Dream Lake ES 40% Construction Presentation 02.01.16
- Site 133-K-8-N-6 Project update Presentation 2.01.16
- Site 133-K8-N-6 Project Update 2.01.16
- Site 133-K8-N-6 Project Update Presentation 2.01.16
- Jones HS Athletic Facility Renovation Presentation 01.27.2016
- Sales Tax Schools Project List 1.25.16
- 27-H-W-4 100% Design Presentation 1.13.16
-
- Site 52-M-SE-2 100% Design Presentation 12.16.15
- Site 133-K8-N-6 (Audubon Park) 100% Design Presentation 12.14.15
- Site 21-M-E-2 100% Design/Construction Kick-off Presentation 11.16.15
- Site 131-PS8-SW-5 100% Design Presentation 11.18.15
- Site 52-M-SE-2 30% Design Presentation 07.29.15
- Sales Tax Resolution 2015
-
-
- West Orlando News Jobs Creation Story
- CFN 13 New Lancaster ES Opens
- Orlando Sentinel Lancaster ES Opens
- Orlando Times Jones spruce-up
- OBJ Jobs Creation Story
- Orlando Sentinel Jobs Creation Story
- Orlando Sentinel new schools story 2013
- Sentinel Blog on Spruce-Up
- WDBO Jobs Creation Story
- Wheatley ES 100% Design Presentation 9.23.13
- WMFE Jobs Creation Story